Water pH Neutralization Plant


Neutralization Plant


Description
All the sinks and floor drains in the lab areas on Floors 1, 2 and 4 of Yeung Kin Man Academic Building are connected by piping down to the Neutralization Plant, which is installed on the basement of the same building. The liquid waste is piped into one of the two fibre glass storage tanks (12m3 litres capacity each) alternatively. A water level controller inside each of the tanks controls the inlet motorized valve's open and close action, which in turn controls the liquid waste feeding into the tank. At any one time, only one tank will accept liquid waste. When a tank is filled up, its' inlet motorized valve will be closed and its' pH control stage will start. Meanwhile, the inlet motorized valve of the other tank will be open to accept wastewater.

Depending on the pH level of the wastewater, either sulphuric acid or sodium hydroxide will be dosed into the fibre glass storage tank by chemical dosing pumps, until the pH value reached the pre-set value of the 6.2~7.9 on the pH controller. The dosing of the chemicals is entirely automatic and controlled by a micro-processor controller. An agitator installed inside the tank is used for mixing the wastewater with the dosing chemicals. The chemical dosing system includes the pH level sensors installed inside the storage tanks, pH controller in the control panel, chemical dosing pumps, chemical storage tanks and feed pipes. All these are housed inside the neutralization plant room.

After the pH value is settled steadily at the pre-set value of 6.2~7.9, the neutralized wastewater will be discharged into the sewer by effluent pumps.

A sump pit with two submersible pumps has been provided inside the plant room to collect any water and/or chemicals overflow from the storage tanks, cleaning of floor and equipment; etc. The wastewater so collected will be fed into the storage tanks for neutralization before discharging to public sewer.

In cases when the Neutralization Plant is broken down due to either equipment failure, lack of dosing chemicals for neutralization purposes, piping leakage, etc., discharge of any wastewater into the system at very short notice.
 
Location
Basement of SC68, Yeung Kin Man Academic Building
 
Notes
Due to safety reasons, site visit can be arranged by advance booking.
 
Enquiry
Mr. Hardy Wong (CDO)
Tel: 3442 6791
Email : hardy.wong@cityu.edu.hk
 
Virtual Help Desk X
元游棋牌游戏| 焉耆| 凤凰百家乐娱乐城| 百家乐电子游戏试| 百家乐官网网上娱乐城| gt百家乐平台假吗| 百家乐游戏种类| 百家乐官网开放词典新浪| 百家乐娱乐平台会员注册| 通榆县| 百家乐赢赌场百家乐| 株洲市| 赌场百家乐代理| 缅甸百家乐官网网站| 单机百家乐棋牌| 百家乐官网赌博策略论坛| 轮盘必胜法| KK百家乐的玩法技巧和规则| 梧州市| 大发888boaicai| 网页百家乐官网游戏下载| 大发888备用地址| 赌神网百家乐官网的玩法技巧和规则 | 大发888娱乐注册| 太阳城百家乐分析解码| 太阳城百家乐官网口诀| 迪威网上娱乐| 百家乐线路图分析| 汇丰百家乐官网的玩法技巧和规则 | 爱拼百家乐现金网| 专业百家乐筹码| 新巴尔虎左旗| 百家乐看图赢钱| 缅甸百家乐官网赌| 百家乐官网开和几率| 波克棋牌免费下载| 聚龍社百家乐的玩法技巧和规则| 百家乐概率计算过程| 现场百家乐官网电话投注| 博彩太阳城| 息烽县|