百家乐怎么玩-澳门百家乐官网娱乐城网址_网上百家乐是不是真的_全讯网888 (中国)·官方网站

Power Interruption in Data Center

by John Chan
 

There will be suspension of electricity to the Data Center (Computer Room) of the Computing Services Center (CSC), around the Lunar New Year's holiday period next year.

It is a statutory requirement by the HKSAR to have all fixed electrical installations to be inspected and tested in a five-year cycle. To do that, all electrical sockets, panels, power source, etc, inside each room in the whole university campus need to be shutdown and tested. Anything that is found to be malfunctioned needs to be replaced on the spot.

This would mean that all computing equipments inside the CSC Data Center need to be shutdown during that checking period. As a consequence, all centrally provided computing services including the whole campus network, the central servers for critical services such as eLearning, email, Banner, etc, will be out of service during that time.

Tentative blackout period for the above exercise will take place on 17th Feb 2007, from 00:00 to 07:00.

As this will seriously affect the normal services of the whole university, the CSC is working very hard on implementing a very detailed plan to prepare for this and to include all possibilities so as to reduce the impact to users to a minimum. The CSC is also seeking cooperation from all departments not to schedule any important events during that period as much as possible.

More announcements on this subject will be made in due course.

 
大发888 xp缺少 casino| 瑞丰娱乐城| 百家乐永利娱乐| 开鲁县| 做生意风水问题| 大发888心得| 百家乐官网怎样出千| 真人娱乐城开户送钱| 豪杰百家乐现金网| 百家乐官网庄河闲的赌法| 大发888娱乐85战神版| rmb百家乐官网的玩法技巧和规则| 大发888真人真钱网址| 澳门百家乐国际| 盐亭县| 大发888二十一点| 百家乐游戏怎样玩| 赌场百家乐官网赌场| 澳门美高梅| 百家乐网站是多少| 赌神网百家乐官网2| 永利百家乐官网游戏| 德州扑克与梭哈| 百家乐庄闲预测| 娱乐网百家乐官网的玩法技巧和规则 | 百家乐官网庄闲出现几| 百家乐官网娱乐城游戏| 沈阳娱网棋牌官方下载| 百家乐透明发牌靴| 喜达百家乐官网的玩法技巧和规则| 福安市| 17pk棋牌游戏| 威尼斯人娱乐平台注册网址| 百家乐打法内容介绍| 大杀器百家乐官网学院| 广州百家乐官网娱乐场| 叶氏百家乐平注技巧| 百家乐官网分析网| 百家乐官网筹码样式| 永发娱乐城| 大发888论坛|