百家乐怎么玩-澳门百家乐官网娱乐城网址_网上百家乐是不是真的_全讯网888 (中国)·官方网站

Network Support for Remote Offices

by Dick Wong

 

Due to a shortage of space, the university is exploring various ways to accommodate new staff and academic programmes. One way of tackling this problem is to adopt a “core-satellite” approach. The “core” represents premises in the Kowloon Tong main campus while “satellite” refers to remote offices and learning centres outside of the main campus. As the number of remote offices and learning centres rises, CityU staff and students are now spread across a wide geographical area in Hong Kong (see map below).

 

As shown in the table below, these remote offices of varying sizes (indicated by the no. of computer outlets) have been around since 2008 and the total bandwidth allocated was normally determined by the number of users or computer outlets installed. But in some cases, departments may recommend the bandwidth themselves due to special needs.

More often than not, the Computing Services Centre (CSC) needs to rely on the Internet Service Provider (ISP) to provide the WAN links from the remote offices to the CityU’s main campus and the rental cost in general is proportional to the bandwidth subscribed. However, in the case of Festival Walk, the CSC had laid its own optical fibre cable between the CSC’s Computer Room and Festival Walk offices, consequently, the CSC was able to offer a higher bandwidth for Festival Walk than other remote offices without paying ISP any rental cost.

 

Remote campus location

Usage

Bandwidth

Computer Outlet

Installation Date

Chak On Market, Sham Shui Po

Staff office

20 Mbps

50

1-Jun-08

Festival Wallk, Kowloon Tong

Staff office

20 Gbps

500

2001

GrandTech, Shatin

Staff office

100 Mbps

20

25-Jul-08

InnoCentre, Kowloon Tong

Staff office

100 Mbps

400

1-May-08

Science Park, Tai Po

Staff office

1 Gbps

300

1-Feb-10

Ka Chi School, Shek Kip Mei

Staff office & learning centres

20 Mbps

60

15-Dec-08

ChinaChem Golden Plaza, TST

Staff office & learning centres

100 Mbps

300

1-Sep-10

Telford Annex, Kowloon Bay

Staff office & learning centres

100 Mbps

-

-

United Centre, Admiralty

Staff office & learning centres

20 Mbps

30

1-Oct-09

Every network, no matter how small, requires care in architecture, security, failover, and performance planning. One poorly designed and unmanaged remote campus can bring everyone down. In fact, the entire network team of the CSC will be involved in the following three stages when setting up a new network for remote offices:

  • IT planning: work with CDFO to identify IT needs and respective procurement for remote offices including planning, budgeting, design, tender, contract administration, site supervision and coordination
  • Project Implementation: monitor the progress of the structured cabling system installation and networking equipment installation including configuration, implementation, testing and acceptance of the network system
  • Ongoing support: supervise the cabling work as requested by departments and monitor the network status 24x7 to ensure the remote IT infrastructure is working properly at all times

Furthermore, as a service provider, the CSC will ensure that both staff and students can enjoy the following set of network services as those on the main campus which include:

  • Internet Service
  • File & Print Service
  • Video Service
  • IP Phone Service
  • Wireless LAN Service

Moving Forward

As set out in the IT Strategic Plan 2010-2015, the CSC will plan to strengthen and extend its support by establishing a common set of standardized network services and their corresponding service levels so that staff and students at remote offices and remote campuses can enjoy comparable, if not the same, quality of services. In particular, with more and more mobile devices and video services on the campus network, in order to achieve agility in network provisionings cost-effectively, the CSC will need to employ new technology to extend network services seamlessly to remote locations and to reduce latency during data transfer as well as to monitor and manage IT infrastructure remotely. In addition, the CSC plans to outsource on-site support to service providers whenever it is cost-effective to do so and will ensure adequate trainings be provided to local support staff at remote offices so as to reduce the support effort required from main campus to a minimum.

 

百家乐官网盛大娱乐城城| 乐宝百家乐官网的玩法技巧和规则 | 大发888官wang| 大发888大发888体育| 百家乐详解| 太阳神百家乐的玩法技巧和规则| 太原百家乐的玩法技巧和规则| 百家乐官网怎么赢9| 百家乐官网下注时机| 百家乐官网必胜软件下载| 威尼斯人娱乐场开户| 棋牌类玩具| 民勤县| 百家乐官网3号眨眼技术| 百家乐官网高科技| 百家乐官网娱乐城博彩通博彩网| 南宁百家乐官网的玩法技巧和规则 | 百家乐网上投注代理商| 百家乐扑克多少张| 新全讯网3344666| 百家乐牡丹娱乐城| 大发888娱乐注册| 太阳城在线娱乐网| 百家乐官网玩法窍门| 百家乐官网扫瞄光纤洗牌机扑克洗牌机扑克洗牌机 | 互联网百家乐官网的玩法技巧和规则 | 做生意放什么东西招财| 百家乐越长的路| 百家乐官网软件| 百威百家乐的玩法技巧和规则| 太阳城假日酒店| 送彩金百家乐官网的玩法技巧和规则 | 金银岛百家乐的玩法技巧和规则| 鸿运国际娱乐| 网上百家乐官网骗人吗| 24山向方位度数| 沙龙百家乐官网怎申请| 南京百家乐官网电| 威尼斯人娱乐城官网lm0| 千亿娱乐网| 百家乐官网网上真钱娱乐|