Due to a shortage of space, the university is exploring various ways to accommodate new staff and academic programmes. One way of tackling this problem is to adopt a “core-satellite” approach. The “core” represents premises in the Kowloon Tong main campus while “satellite” refers to remote offices and learning centres outside of the main campus. As the number of remote offices and learning centres rises, CityU staff and students are now spread across a wide geographical area in Hong Kong (see map below).

 

As shown in the table below, these remote offices of varying sizes (indicated by the no. of computer outlets) have been around since 2008 and the total bandwidth allocated was normally determined by the number of users or computer outlets installed. But in some cases, departments may recommend the bandwidth themselves due to special needs.

More often than not, the Computing Services Centre (CSC) needs to rely on the Internet Service Provider (ISP) to provide the WAN links from the remote offices to the CityU’s main campus and the rental cost in general is proportional to the bandwidth subscribed. However, in the case of Festival Walk, the CSC had laid its own optical fibre cable between the CSC’s Computer Room and Festival Walk offices, consequently, the CSC was able to offer a higher bandwidth for Festival Walk than other remote offices without paying ISP any rental cost.

 

Remote campus location

Usage

Bandwidth

Computer Outlet

Installation Date

Chak On Market, Sham Shui Po

Staff office

20 Mbps

50

1-Jun-08

Festival Wallk, Kowloon Tong

Staff office

20 Gbps

500

2001

GrandTech, Shatin

Staff office

100 Mbps

20

25-Jul-08

InnoCentre, Kowloon Tong

Staff office

100 Mbps

400

1-May-08

Science Park, Tai Po

Staff office

1 Gbps

300

1-Feb-10

Ka Chi School, Shek Kip Mei

Staff office & learning centres

20 Mbps

60

15-Dec-08

ChinaChem Golden Plaza, TST

Staff office & learning centres

100 Mbps

300

1-Sep-10

Telford Annex, Kowloon Bay

Staff office & learning centres

100 Mbps

-

-

United Centre, Admiralty

Staff office & learning centres

20 Mbps

30

1-Oct-09

Every network, no matter how small, requires care in architecture, security, failover, and performance planning. One poorly designed and unmanaged remote campus can bring everyone down. In fact, the entire network team of the CSC will be involved in the following three stages when setting up a new network for remote offices:

  • IT planning: work with CDFO to identify IT needs and respective procurement for remote offices including planning, budgeting, design, tender, contract administration, site supervision and coordination
  • Project Implementation: monitor the progress of the structured cabling system installation and networking equipment installation including configuration, implementation, testing and acceptance of the network system
  • Ongoing support: supervise the cabling work as requested by departments and monitor the network status 24x7 to ensure the remote IT infrastructure is working properly at all times

Furthermore, as a service provider, the CSC will ensure that both staff and students can enjoy the following set of network services as those on the main campus which include:

  • Internet Service
  • File & Print Service
  • Video Service
  • IP Phone Service
  • Wireless LAN Service

Moving Forward

As set out in the IT Strategic Plan 2010-2015, the CSC will plan to strengthen and extend its support by establishing a common set of standardized network services and their corresponding service levels so that staff and students at remote offices and remote campuses can enjoy comparable, if not the same, quality of services. In particular, with more and more mobile devices and video services on the campus network, in order to achieve agility in network provisionings cost-effectively, the CSC will need to employ new technology to extend network services seamlessly to remote locations and to reduce latency during data transfer as well as to monitor and manage IT infrastructure remotely. In addition, the CSC plans to outsource on-site support to service providers whenever it is cost-effective to do so and will ensure adequate trainings be provided to local support staff at remote offices so as to reduce the support effort required from main campus to a minimum.

 

百家乐官网扑克投注赢钱法| 大发888wofacai官网| 南宁百家乐官网的玩法技巧和规则 | 利高在线娱乐城| 德江县| 百家乐官网游戏卡通| 百家乐现金网最好的系统哪里有可靠吗| 网上赌博网址| 百家乐冯耕耘打法| 百家乐官网必胜软件下载| 百家乐赢退输进有哪些| bet365娱乐场150| 百家乐要怎么玩啊| 缅甸百家乐官网网上投注| 百家乐视频游戏官网| 百家乐官网赌场讨论群| 德州扑克的玩法| 百家乐怎么样投注| 如何看百家乐官网路| 新奥博娱乐城体育投注| 百家乐赢率| 首席百家乐官网的玩法技巧和规则 | 百家乐永利娱乐城| 大赢家百家乐官网66| 大西洋百家乐的玩法技巧和规则 | 大发888娱乐城范本| 百家乐客户端LV| 个人百家乐官网策略| 盈丰娱乐城| 百家乐翻天下载| 百家乐官网5式直缆投注法| 大发888送体验金| 百家乐投注玩多少钱| 百家乐官网视频游戏世界| 大发888古怪猴子| 百家乐空调维修| 百家乐遥控牌靴| 百家乐官网诀| 金赞百家乐官网现金网| 百家乐是怎么赌法| 威尼斯人娱乐场官网网站是多少|