Deploying High Density Rack Power to Support High Performance Computing in CityU

by Manfred Chan


City University of Hong Kong (hereafter CityU) aspires to become a leading global university, excelling in research and professional education. To address the growing needs arising from our strategic interdisciplinary research areas as laid out in our Strategic Plan 2020–2025, the Computing Services Centre (CSC) had built a centralised High Performance Computing (HPC) system (named CityU Burgundy) to provide state-of-the-art capability in computationally intensive research areas. It was first introduced in September 2021. Researchers from various disciplines had heavily used the HPC resources since the launch of the facility. In fact, some researchers had even decided to contribute their research funding to further expand the capability of the CityU Burgundy. 

The HPC IT workloads that spanned across eight racks with a power consumption of 15kW each (a total of 120kW) were protected by a 200kW Uninterruptible Power Supply (UPS) System. Along with the proliferation of compute-intensive workloads, the rack power requirements have also gone up.  In order to fully utilize the precious University Space, the CSC has deployed high-density racks that can support 50kW IT workloads per rack to replace the existing ones. The new high-power racks can support more powerful servers that provide the overall theoretical peak performance up to 1.7PFLOPS.

HighDensityRacks-1.png
?The layout of high-density racks for hosting HPC servers

High-density racks are not common. High power consumption will generate a lot of heat energy and in turn, requires stable cooling facilities. To the best of our knowledge, CityU is the first institution in Hong Kong to build a data centre with 50kW power per rack. The rack was designed to provide electric power with two power feeds, one from Normal and the other from UPS. There are sufficient intelligent PDUs to give the redundancy power supply to each compute HPC node. Each 50kW cabinet is equipped with an internal fire compression unit to protect the whole data centre even if there is a fire incident inside the high-density 50kW rack. The power consumption of each power outlet can be monitored remotely via the management network by the Data Centre Infrastructure Management (DCIM) system. The Operations team in the Network Operations Centre can monitor the system status and receive alerts if there is over-usage on the power consumption.

This is just the beginning. The CSC will continue to optimise its high-density data centre for HPC processing-intensive applications.  The key is to evaluate the current infrastructure from time to time and understand which technology will work best for them.

 

百家乐官网冯式打法| 全讯网zq06| 利都百家乐官网国际娱乐平台| 百家乐美国玩法| 百家乐官网赌假的工具| 百家乐的必赢方法| 爱拼国际娱乐| 线上百家乐官网手机版| 大发888游戏平台寒怕| 新葡京百家乐官网的玩法技巧和规则 | 香港六合彩大全| 爱博| 百家乐统计概率| 出国| 威尼斯人娱乐场送18| 国际娱百家乐官网的玩法技巧和规则| 大发888怎么赢钱| 百家乐投注注技巧| 现金百家乐官网赢钱| 六合彩马报| 澳门百家乐赌博技巧| BB百家乐官网大转轮| 百家乐英皇娱乐场| 百家乐官网群1188999| 宝马会百家乐的玩法技巧和规则| 皇冠网上投注站| 易学24山3d罗盘App| 娱乐城网址| 百家乐扎金花斗地主| 阜新市| 玩网上百家乐的技巧| 百家乐官网押注最高是多少| 百家乐正品| 大发888客服咨询电话| 百家乐庄闲的分布| 昭通市| 莆田棋牌游戏| 江川县| 正规百家乐平注法口诀| 百家乐和局投注法| 做生意忌讳什么颜色|