百家乐怎么玩-澳门百家乐官网娱乐城网址_网上百家乐是不是真的_全讯网888 (中国)·官方网站

University seeks consultation over CCCU Building site

Shirley Lam

 

After two months’ study, the University identified six possible sites for the proposed Community College of City University (CCCU) building and is now in the process of seeking university-wide consultation. In an open forum on 8 November organized by the Management Board Secretariat, Professor Y S Wong, Vice-President (Administration) and Mr Arthur Leung, Director, Campus Planning Office (CPO), presented the proposed sites and their pros and cons to some 50 staff who attended the forum.

 

Six possible on-campus sites identified

Following the Council's decision in August 2004 to locate the CCCU building on campus, the University appointed consultants to prepare a detailed study on the possible locations. The new building will be a self-contained premise with its own learning and support facilities to mitigate the increased loading on the University campus and facilities. It will include classrooms and lecture theatres, computer laboratories and other specialist areas; staff offices for academic, administrative, support and part-time staff; student and staff amenities including multi-purpose sports hall, student canteen and kitchen, student union, exhibition space student services; and learning resources centre.

 

Six possible sites, all of which fulfilling the projected space requirement of 40,000 square metres for a probable full-time student number of 6,000, were identified for consideration.  In identifying these sites, the Consultants have carried out studies on each of the following aspects: statutory planning, impact on the neighborhood, landscaping, structural and geotechnical issues, building services, environmental, traffic and transport, existing infrastructural facilities within the University, existing MTR tunnels, and existing Shek Kip Mei Park facilities.

 

All the sites have pros and cons. (More information is available at http://www.ncm2.xyz/cpo/forum8nov.pdf ). Some of the possible sites such as Site A, which is built over the MTR tunnel, may create technical difficulties and thus induce a higher cost. Some locations which need to seek approval from the Town Planning Board for example, Site A again for meeting the height requirement, or Sites Y and Z for change of land use, may cost a longer construction time. Other sites like Sites D or X, which reside on steep slopes or valleys, may call for a higher cost incurred by complicated site formation works (see http://www.ncm2.xyz/cpo/programme.pdf  for comparisons of budget and duration).

 

Comments are welcome 

In view of the future development of the higher education sector and growing student numbers due to the four-year curriculum, increase in non-local students and self-financing students, the Management Board recommended at its meeting on 5 November that the site selection for the CCCU building be based on the following principles: to allow for maximum land potential on campus for future developments of both the University and CCCU to accommodate targeted student numbers, to offer convenient access to the CCCU and to mitigate increased pedestrian traffic on the current access route to the University campus; to preserve the present environment; and to minimize the project cost and duration. The MB therefore recommended sites B and Z, or a hybrid of both sites, as the more desirable options.

 

At the open forum, staff and students expressed their concern about the importance of convenient access and that additional access is essential to divert the heavy traffic. They were also concerned that the choice of site should be conducive to students sharing academic facilities on the University campus. More comments on the proposed sites are welcome. Staff and students are invited to share their opinions and suggestions from now till 14 November via cpoadmin@cityu.edu.hk

 

Upon solicitation of feedback, the Council will make decision on  the exact location of the site on 16 November. The CCCU Board of Management has decided to apply for a government loan to finance the building project and the University will submit an application for the loan on 20 November.

 

 


你可能感興趣

聯絡資料

傳訊及數據研究處

Back to top
威尼斯人娱乐平台最新地址| 大发888注册的微博| 赌王百家乐官网的玩法技巧和规则 | 如何看百家乐的玩法技巧和规则| 伟易博| 百家乐pc| 百家乐官网去哪里玩最好| 红宝石百家乐官网的玩法技巧和规则 | 做生意的摆件| 百家乐官网赌博技巧大全| 真人百家乐赌场娱乐网规则| 百家乐官网平注法技巧| 百家乐娱乐网官网网| 天津市| 大杀器百家乐学院| 网络百家乐官网真人游戏| 大发888网页版免费| 百家乐官网平玩法几副牌| 大发888官方备用网址| 百家乐网络投注| 黄金城娱乐城| 百家乐龙虎扑克| 百家乐官网必胜赌| 仪征市| 大发888代充值存款| 24山72向水口吉凶断| 百家乐官网破解版下载| 百家乐游戏大| 百家乐永利娱乐城| 注册百家乐官网送彩金 | 闲和庄百家乐赌场娱乐网规则| 七胜百家乐官网娱乐城总统网上娱乐城大都会娱乐城赌场 | 百家乐官网又称什么| 晓游棋牌官方下载| 2016虎和蛇合作做生意| 澳门百家乐官网游戏皇冠网 | 镇康县| 机器百家乐作弊| 破战百家乐官网的玩法技巧和规则| 北川| 瑞丰娱乐场|